ALX Company Inc.

"Point to Point Connectivity"
CSLB # 759610

Double-click here to edit the text.

alxsite004002.gif

ALX Company Inc. performed the turnkey install for the Law Offices of TR Winston in less than 24 hrs. After trading closed on a Friday afternoon, our team moved in and went to work on the installation of 124 Cat 5E locations, equipment rack and other components. The network was up and running before Sunday morning, in time for the IT team to reroute a T1 circuit and install new Shoretel switching gear. This installation was performed by three of our technicians.
ALX Co. Inc 24 hr turnkey install
The ALX team completed 27 Southern California Walgreens stores, Ink Jet Cafe Rollout installations throughout Southern California in less than 14 calendar days. This project consisted of new electrical receptacles and Category 5E cabling to onsite IDF cabinets. Electrical and data network cabling testing, installation times and digital photographs were used to document this achievement for Corporate Walgreens.
The 110 Classroom campus of Crenshaw High School was performed in record time. The project consisted of approx 680 Cat 5E cable locations, Mulit mode fiber optic cabling within modular classrooms and installation of Local Distribution Frame cabinets within the classrooms. This job was a PSA ( Project Stabilization Agreement) Local Union, prevailing wage and certified payroll project. Our team was able to minimize the local union labor neccesary to complete the workload and thereby reducing the total man-hours neccesary to perform the work.
Walgreens Ink-Jet Cafe project rollout in 12 days
LAUSD Crenshaw High School completed in RECORD TIME !!
Here are a few case studies of recent projects delivered by ALX and our project team.......